For an OEM sanitaryware order, agree what will be inspected before production, after the first items are made and before shipment. Tie the inspection to an approved sample, drawing revision and purchase-order scope. Ask for records of what was inspected and how defects were handled.
Copy this inspection checklist
Exact model and revision
Approved reference sample
Agreed appearance and measurement criteria
Functional checks specified by the buyer
Inspection lot and method
Person authorised to release or hold the order
What should be checked at each stage?

Samiyah SA4001 Ceramic One-Piece Toilet. Catalogue example only; confirm the exact specification and commercial scope separately.
Before bulk production
Review the controlled drawing, finish reference, packaging and included parts. Establish the method for any dimensional or functional checks. Ask the supplier to confirm which characteristics it checks routinely and which require a separate inspection or test.
During and after production
Request first-piece or in-process evidence for any characteristic that is difficult to correct once the lot is complete. At final inspection, reconcile cartons, labels and lot identifiers with the order. Record measurements, photos and observations rather than only reporting pass or fail.
What happens after a failed inspection?
Agree who quarantines affected stock, how the supplier identifies the affected lot and what proof is needed after rework or replacement. Release only against the agreed evidence. Inspection evidence does not replace a technical declaration or prove a different model conforms.
Frequently Asked Questions
Is a display sample enough for quality control?
No. Keep a signed reference and written criteria. A photograph alone may not capture surface, colour or functional differences.
Can inspection results be reused for another finish?
Only if they cover the exact characteristic and configuration under review. Ask for new evidence where a variation affects that result.