For each room, record installed component references, checks completed under the approved commissioning plan, defects and service access. Hand the as-built record and current maintenance instructions to the operator. A room that looks finished is not necessarily commissioned.

Samiyah WT919-032 concealed toilet cistern and installation frame. Samiyah catalogue photograph, shown as an individual product reference.
Build the record before walls are closed
Capture references and as-built evidence
Record the room number, cistern, frame, actuator, bowl and seat separately. Add dated drawing revisions and photos from the agreed inspection stage. If WT919-032 and GB058 are listed in an enquiry, record the exact item delivered against each line. Their presence in one schedule does not establish compatibility.
Record the commissioning result
Assign checks to the responsible contractor
Ask for the approved project checks, test date, observed result and reviewer. The checklist can record refill and shut-off behaviour, control operation, accessible connection leakage and any abnormal noise or movement. The approved procedure and acceptance limits come from the project and manufacturer documents, not this article.
Track each defect to closure
Assign an owner, status and reinspection evidence to each outstanding issue. A neighbouring room passing inspection does not close the item. Use a room-level handover register with component IDs, test date, check result, defect reference, responsible person and closure date.
Prepare an operator-ready handover
Provide current instructions, approved access details, identifiable service-parts data where available and who to contact. Demonstrate the normal approved access route. If a manual or parts reference is missing, record the gap and owner instead of substituting an unverified part or generic instruction.
Frequently Asked Questions
Is the flush plate reference enough?
No. Keep component-level records so facilities staff can find the correct instructions and obtain confirmation before ordering replacements.
When should the team take inspection photographs?
At the approved inspection stage while relevant connections and identifying labels remain visible.
Catalogue references and project enquiries
WT919-032 — Concealed Toilet Cistern For Wall-Hung Toilet Systems
Confirm the exact system and model documentation before ordering. The catalogue references do not establish compatibility or certification for a specific installation.